Palm Bay Aquatic Center

The project is a joint effort between Brevard Community College, the City of Palm Bay and the Brevard County School Board.

The pool is uniquely designed to include eight 25-yard swim lanes, an offset diving area, and an offset area with a beach entry, water slide and water play features.

City

Palm Bay, United States

Technology

Myrtha technology

Surface

52x22,9 m

Depth

0-3,7 m

Location

Outdoor

Accessories

Related projects

All projects